Cernol Chemicals swan logo

Solvents for Mining in Namibia

Mine electrical maintenance runs on solvent discipline: motors, switchgear and control gear cleaned residue-free, re-energised fast, deep underground or far up a dusty hill. The mining sheet lists both Solvene 44 and 33 as “electrical cleaner” — the fast-drying grade first, because on a mine, downtime is the currency.

The local problems this range solves

  • Conductive dust loading motors and switchgear
  • Re-energising deadlines after electrical cleaning
  • Enclosed electrical rooms and underground vapour management
  • Solvent logistics and flammable storage on site
  • Contractor crews with mixed solvent habits

Compliance & documentation

Flammable-goods handling on mines runs under permit and storage regulation; SDS documentation and quantity guidance ship with the product.

Local tip

Issue Solvene in one-litre labelled bottles from stores — the drum stays in the flammables store, the bottle rides the toolbag, and the audit finds both where they belong.

Recommended products

The lines mining buyers draw from this category most.

Solvene 44 pack

Solvene 44

SolveneTechnical

Fast-drying solvent cleaner for electrical parts (liquid) — minimal downtime before re-energising.

Available in5 L25 L

Available from: Windhoek

Solvene 33 pack

Solvene 33

SolveneTechnical

Solvent cleaner for electrical parts (liquid) — trucks, boats and fixed plant.

Available in5 L25 L

Available from: Windhoek & Walvis Bay agent

Solvene 222 pack

Solvene 222

SolveneTechnical

Solvent cleaner in aerosol format for spot cleaning and awkward access.

Available inAerosol5 L25 L

Available from: Windhoek

MPC Degreaser pack

MPC Degreaser

Industrial

Multi-purpose degreaser for engine parts — the workshop standard across transport, mining and fishing segments.

Available in5 L25 L

Available from: Windhoek & Walvis Bay agent

Browse the full Solvents range →

Solvents for mining: asked and answered

Why does the mining sheet list Solvene 44 ahead of 33?

Downtime arithmetic: Solvene 44’s faster flash-off shortens the cleaned-to-re-energised window, and on a mine that window is measured against production loss per hour. Solvene 33 remains the volume workhorse for planned maintenance where evaporation time is free; 44 owns the breakdown work. Both leave contacts residue-free — the choice is purely about when the switch may close again.

How does conductive mine dust change electrical cleaning?

It makes cleaning frequency a protection measure: ore dusts loaded with mineral conductors track across insulators and invite flashover, so motors and switchgear on Namibian mines clean on schedule, not on visible dirt. The method matters too — vacuum or brush the bulk dry first, then Solvene the remainder; solvent applied straight onto heavy dust just relocates a conductive slurry into the windings. Dry first, dissolve second.

What are the rules for solvent work in enclosed electrical rooms and underground?

Vapour is the hazard multiplier: forced ventilation before and during work, no hot work in the vapour zone, quantities underground limited to the task, containers sealed the moment pouring stops, and re-entry/re-energising held until evaporation is verifiably complete. The mine’s flammables permit system will say all this; the practical discipline is taking down only what the job needs. Small bottles, filled at surface stores, beat drums in a substation every time.

How should site stores manage flammable solvent stock?

A ventilated flammables store away from oxidisers and ignition, drums grounded during decanting, stock rotated first-in-first-out (heat ages solvent seals), and issue in labelled pump bottles rather than open tins — evaporation in site heat steals more solvent than the work does. Cernol supplies SDS and storage guidance sized to your holding; most belt sites settle on a monthly Solvene delivery matched to the maintenance plan.

Serving Mining from our Windhoek branch

Cernol Chemicals Windhoek — Factory & Sales Office · Cnr Kallie Roodt & Etienne Rosseau Street, Northern Industrial Area, Windhoek · Tel 061 262 985 · Mon–Fri 08:00–17:00

Keep exploring

Quote solvents for your mining operation

Served primarily from Cernol Chemicals Windhoek — Factory & Sales Office — 061 262 985. SDS, grades and delivery scheduling included in the quote.